Skip to content
Thickness in mils, inches or millimetres Width and roll length on the same line Grade files belong to the quoted item

Same-basis factory request

greenhouse plastic panels request matching

Greenhouse Plastic Sourcing turns a greenhouse plastic panels brief into one specification list several factories can quote. We do not sell a configurator license, host CAD files, or appoint distributors.

Rigid greenhouse cover panels stacked for inspection

Shortest request a factory can still quote

Four fields have to be fixed before the request is sent. Everything else can be marked “to confirm” without inventing a default.

  1. Thickness — inches, mils or millimetres; wall count if a multiwall panel is named.
  2. Width and length — panel width and sheet length, or roll width if the buyer later switches form.
  3. Treatment — clear, treated, printable, or UV stabilizer / HALS package ask.
  4. Quantity and destination — unit count and US state or postal code.

What is quantity-driven and what is one-off

A one-off sample or a first-article cut does not set the production packing. Write both if both exist.

Quantity-driven lines

Production lots, repeating seasonal replacements, and multi-house roll-outs need quantity against each configuration. Melt flow index (MFI / MFR g/10 min) is asked only when the factory uses it to separate film grades.

Repeating buys
ItemUnit
Production quantityrolls, sheets or panels
Density if used to split gradeg/cc

One-off checks

A sample, a first-article dimensional report, or a one-house trial is a separate line. Do not let a salesperson fold it into the production unit price without writing the split.

Single events
ItemNote
SampleApprove before the lot, if required
Dimensional reportNamed ASTM method on that piece

Width and roll length stay paired

A factory that quotes width without length, or length without width, has not yet answered the line. Send it back. Return an incomplete reply

How this desk is reached

There is no published street warehouse and no public phone book. The inquiry form is the working channel.

Written brief

Use the contact form. Name, work email and the procurement requirement are required. Drawings follow by reply; the form has no upload field.

What we send on

The same specification list to more than one factory. We do not rewrite a missing thickness or invent a destination.

Working sequence

Brief in, missing fields left visible, factories asked, replies lined up on the same Incoterms and document set.

Send the greenhouse plastic panels line as one list

No stock count, no factory appointment, and no percentage against an unnamed market price. Comparison stays on the written axes.

Send Your Requirement Sheet